On June/ 2019, we have received a order for installation windfarm project with the below information:

  • Number of WTG: 6 pcs
  • Location: Nhon Hoi Economic Park – Binh Dinh Province
  • Specification:
    + Hub Height: 114m
    + Heaviest items weight: 104 t
    + First tower weight: 90.52t
  • Type of WTG: SGRE, Capacity 3.5 MWAfter check and calculate, we make plan to use crawler crane 650t with 120m main boom length and special jib 12m for windmill configuration, this specification also have 100t counter weight superlift. It is a special configuration for 650t crawler crane class.Due to using Superlift configuration so the assembly – disassembly crane will take time more than another 650t crane class (3.5 days), however here is the best solution for reducing cost. Beside it, the compact size for crane is an advantage for this configuration.

    We have used the crane model Sany SC6500A at this job site, this model really power for installing wind farm project because of this crane was designed for wind configuration.

    Tobe known that Phuong Mai 3 windfarm project was constructed with IEC standard and turbine type G132-3.465, Maximum output capacity 21MW, estimated operation time in October/2019. However, the construction was built in rain season, so some category were delayed

    Completed installation 6 WTG within 5 weeks, how can we match the schedule with safely?